Central London Visitor Moorings Survey

Below is a preview of the online survey. Please familiarise yourself with these questions before completing the online version and be prepared to write some draft responses that you can share with others. When you are ready to access the online survey then you will find it at https://www.surveymonkey.com/s/CentralLondonVMs. Remember to submit it by 9am on Monday 7th July.

Some details about you


1. Please enter your name below.

2. Please enter your email address below

3. Are you associated with, or do you represent, a specific organisation or association? If yes, which one?

4. What is your boat index number (if applicable)?

5. What sort of boat licence do you have (if applicable)?

Standard private
Trader
Other (please specify)

6. Do you have a home mooring (if applicable)?

No (ie. you are a continuous cruiser)
Yes

Kensal Green


We propose to designate the easternmost 45 metres of Kensal Green visitor mooring as 7 day maximum stay. The remainder of the visitor mooring site (321m) will stay as 14 days.

7. Overall, do you object to the proposed changes at this visitor mooring?

Yes
No

8. Do you think the proposed reduced stay time on part of this visitor mooring is:

Too short
About right
Too long

9. Do you think the length of the section where we're proposing a shorter stay time is:

Too short
About right
Too long

10. Do you have any further comments about the proposed changes to the Kensal Green Visitor Mooring?

Little Venice


This site is currently a 14 day visitor mooring. We propose to reduce the stay time on half the designated Visitor Mooring (124m) to 7 days. The western 124m will remain a 14-day visitor mooring.

11. Overall, do you object to the proposed changes at this visitor mooring?

Yes
No

12. Overall, do you think the proposed reduced stay time on part of this visitor mooring is:

Too short
About right
Too long

13. Do you think the length of the section where we're proposing shorter stay times is:

Too short
About right
Too long

14. Do you have any further comments about the proposed changes to the Little Venice Visitor Mooring?

Broadway Market


This is currently 14 day casual mooring. The Trust installed 27 new mooring rings here in October 2013. As it has become a popular location over the last 2 years and is frequently at capacity, we intend to designate the western 3-4 berths as a 7 day visitor mooring.

15. Overall, do you object to the proposed changes at this visitor mooring?

Yes
No

16. Do you think the proposed reduced stay time at this visitor mooring is:

Too short
About right
Too long

17. Do you think the length of the visitor mooring is:

Too short
About right
Too long

18. Do you have any further comments about the proposed changes to the Broadway Market Visitor Mooring?

Victoria Park


This is currently a 14 day visitor mooring. It is proposed to shorten the stay time to 7 days along the whole visitor mooring.

19. Overall, do you object to the proposed changes at this visitor mooring?

Yes
No

20. Do you think the proposed reduced stay time at this visitor mooring is:

About right
Too long

21. Do you think the length of this visitor mooring is:

Too short
About right
Too long

22. Do you have any further comments about the proposed changes to the Victoria Park Visitor Mooring?

Your suggestions


23. Are there any other locations where new visitor moorings would be desirable? Please specify.

24. Are there any other locations where we could provide new mooring rings to improve casual towpath mooring? Please specify.

25. Overall, do you think the plan we are proposing is a positive one?

Yes
Partly
No